M-AD

GMobile-ADS

Monday, 23 February 2015

The Just Ended 45-Mins Downpour Caused On Akonwojo Road See Photo.


Reading from a twitter handle which has tweeted the ‘damage’ a 45-mins downpour has caused on the area of Akonwojo road, in Egbeda Lagos. According to the twitter handle, the rain lasted for 45 mins and it has caused heavy traffic on the road, due to the present flood as seen in the photo above.
The flood was caused by bad drainage system. See more photos below, Sorry guys! too bad.


And Ikeja wasn't left out either...


No comments :

Post a Comment

Disclaimer: All the comments on this blog are the personal opinions of those who have comment it (commentators)

--------------------------------------------------------------------------------------------

Advertise with us: E-mail: enyinnayaemma@gmail.com

Note: only a member of this blog may post a comment.

ADVERTISEMENT

Share